Deep well - for geothermal power - onshore - 6000m (deep well drilling - for geothermal power - onshore - 6000m)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the drilling of a borehole of 5 500m depth and 6 000 m length for geothermal power generation in an unspecific rock formation. The infrastructure represent a rotary drilling technology used for the exploitation of the deep rock formations similar to the oil and gas production. It is assumed to have a lifetime of 50 years. The process includes all energy uses materials and emissions for drilling of an onshore borehole and finishing of the well but excludes needed materials and energy use for closure of the well after its use the different rock characteristics and land use. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Deep well - for geothermal power - onshore - 6000m (deep well drilling - for geothermal power - onshore - 6000m) |
Sector | Buildings and Infrastructure |
Category | Infrastructure |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2008 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Infrastructure Emission Factors
Explore All- Go to Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Buildings and Infrastructure Buildings and Infrastructure21 Factors21 Factor - Go to Transportation of natural gas by pipeline
Transportation of natural gas by pipeline
Buildings and Infrastructure Buildings and Infrastructure8 Factors8 Factor - Go to Transportation of crude oil and other commodities by pipeline
Transportation of crude oil and other commodities by pipeline
Buildings and Infrastructure Buildings and Infrastructure7 Factors7 Factor