Photovoltaic slanted-roof installation - 3kwp - cdte - laminated - integrated - on roof (photovoltaic slanted-roof installation - 3kWp - CdTe - laminated - integrated - on roof)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an infrastructure representing the installation of a photovoltaic slanted-roof 3kWp CdTe laminated integrated on roof. The infrastructure has a capacity of 3kWp and a lifetime of 30 years. The process includes all the components for the installation of a photovoltaic plant energy use for the mounting and decommission. The solar laminates are integrated in the roof construction and thus replace the normal roof cover. The installation is possible with a simple metal construction for the panels or as solar cells roof tiles. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Photovoltaic slanted-roof installation - 3kwp - cdte - laminated - integrated - on roof (photovoltaic slanted-roof installation - 3kWp - CdTe - laminated - integrated - on roof) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 2004 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor