Emission Factor
Uranium enrichment centrifuge facility (uranium enrichment centrifuge facility construction)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of uranium enrichment centrifuge facility. The facility has capacity of 1 500 tons SWU (separative work unit). The process includes land use energy (electricity diesel and light oil) and material requirements for the construction of the facility and decommission. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Uranium enrichment centrifuge facility (uranium enrichment centrifuge facility construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 1980 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_uranium_enrichment_centrifuge_facility_uranium_enrichment_centrifuge_facility_construction
UUID
dfb8b60a-8334-476d-acfb-a5602002ec71
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor