Emission Factor
Bentonite quarry infrastructure (bentonite quarry construction)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of bentonite quarry infrastructure. It has a yearly production of 345 743 tons betonite an assumed of 50 years for stationary (e.g. buildings concrete foundations etc.) and 25 years for mobile equipment. The production includes the area of the built infrastructure (buildings roads etc.) machines and conveyor belts used for bentonite production. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Bentonite quarry infrastructure (bentonite quarry construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 1997 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_bentonite_quarry_infrastructure_bentonite_quarry_construction
UUID
ec5b85fd-7c56-40fb-a266-a44b25e39df7
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure13 Factors13 Factor